Scroll one stitch at a time, or jump with the index.
Knit 2 stitches, pull first stitches over the second stitch, knit 1, pull first stitch over the second stitch - repeat all the way to the end of your work, cut yarn and fasten off tail
Also known as rev-YO (Reverse yarn over). Wrap yarn on the needle from the back to the front.
Also known as: C4F - Slip 2 stitches purlwise onto a cable needle and let it hang at the front of your work. Knit the next 2 stitches. Knit the stitches of the cable needle.
Also known as: C4B - Slip 2 stitches purlwise onto a cable needle and let it hang at the back of your work. Knit the next 2 stitches. Knit the stitches of the cable needle.
Also known as: c2r - Slip 2 stitches purlwise onto a cable needle and let it hang at the back of your work. Knit the next 2 stitches. Knit the stitches of the cable needle.
Also known as: c2l - Slip 2 stitches purlwise onto a cable needle and let it hang at the front of your work. Knit the next 2 stitches. Knit the stitches of the cable needle.
Also known as S2KP2. Slip 2 stitches together as if to knit, knit 1, pass slipped stitches over the knit stitch.
A pattern that consists of working knit stitches on every round or row for both the right and the wrong sides
With yarn in the back, insert the right needle into the first stitch knit-wise, wrap your yarn around the right needle, scoop the right needle towards you, under the stitch on your left needle, move the stitch off the left needle.
Pick up the stitch below the next stitch on your left needle, as well as the next stitch to be worked. Knit through both loops.
knit 2 stitches together
knit 3 stitches together
knit into the front and back of the stitch
knit into the front of the stitch, then into the back of the stitch, then again into the front of the stitch
Increase stitch, Also known as LSI or LLI: Insert left needle in the left leg of the stitch underneath the stitch on the needle, knit through that stitch
Increase stitch, Also known as RSI or RLI: Insert needle in the right leg of the stitch underneath the stitch on the needle, place stitch on the left needle
Decrease: knit 1 stitch, slip the stitch, pass second stitch over first stitch, return stitch to right needle
Slip 1 stitch purlwise onto a cable needle and let it hang at the front of your work. Knit the next stitch. Knit the stitch of the cable needle.
Increase stitch, Also known as kll or LSI: Insert left needle in the left leg of the stitch underneath the stitch on the needle, knit through that stitch
Increase stitch, Also known as kll or LLI: Insert left needle in the left leg of the stitch underneath the stitch on the needle, knit through that stitch
Increase: With your left hand needle pick up the bar between two stitches from front to back, knit through the back loop
Increase: Add a loop on the right needle with the yarn facing away from you
Increase: With your right hand needle pick up the bar between two stitches from back to front and place on the left needle as if front to back, knit the stitch through the back loop
Increase: Pick up the bar between two needles by inserting your working needle under the bar from front to back, purl through the back loop
Increase: Pick up the bar between two needles by inserting your working needle under the bar from back to front, purl.
Increase: With your right hand needle pick up the bar between two stitches from front to back and place on left needle as if from back to front, knit through the front loop
Increase: Add a loop on the right needle with the yarn facing towards you
Make a few stitches by a series of yarn overs and knitting to the same stitch. Work in stockinette stitch for a few rows, then start decresing by working 2 together over few rows, finish with binding off the last stitch.
With the yarn in the front of your work, insert the right needle from back to the front of the first stitch, wrap your yarn around the right side of your right needle counter-clockwise, Slide the right needle down and bring the point from front to back of the stitch, bringing the yarn with it. Slip the stitch off the left needle.
Decrease: Slip two stitches together knitwise, knit the next stitch. Pass the two slipped stitches over (as if to bind off).
purl 2 stitches together
purl 3 stitches together
purl 1 into front and back of a stitch
purl into the front of the stitch, then into the back of the stitch, then again into the front of the stitch
Decrease: Slip one stitch purlwise, knit 2 together, pass the sliped stitch over (as if to bind off)
With right side facing, insert the right needle into the next bind-off or pendicular stitch from front to back, wrap the yarn over the needle and pull a loop.
Slip 1 stitch purlwise onto a cable needle and let it hang at the back of your work. Knit the next stitch. Knit the stitch of the cable needle.
A pattern that consists of working knit stitches on the wrong-side, and purl stitches on the right-side.
Also known as byo (Backward yarn over). Wrap yarn on the needle from the back to the front.
Increase stitch, Also known as krl or RSI: Insert needle in the right leg of the stitch underneath the stitch on the needle, place stitch on the left needle
Increase stitch, Also known as krl or RLI: Insert needle in the right leg of the stitch underneath the stitch on the needle, place stitch on the left needle
Also known as cdd (Center double decrease). Slip 2 stitches together as if to knit, knit 1, pass slipped stitches over the knit stitch.
Decrease: Also known as sk2po. Slip the first stitch knitwise, knit two stitches together, pass the slipped stitch over the knit 2 together.
Also known as sk2p. Slip the first stitch knitwise, knit two stitches together, pass the slipped stitch over the knit2tog.
Also known as: skpo. slip 1 knitwise, knit 1, pass slip stitch over
Also known as: skp. slip 1 knitwise, knit 1, pass slip stitch over
Pass the stitch to the right needle without working it.
Insert the needle into the stitch knitwise and pass the stitch to the right needle without working it.
Insert the needle into the stitch purlwise and pass the stitch to the right needle without working it.
Usually used in the beginning of the work - the first stitch made.
Left leaning decrease: Slip 1 knitwise, slip 1 knitwise, insert left needle into both slipped stitches, knit slipped stitches together.
Left leaning decrease: Slip 1 knitwise, slip 1 knitwise, move 2 slipped stitches back to left needle, purl the two stitches together.
Decrease: Slip 1 knitwise, slip 1 knitwise, slip 1 knitwise, insert left needle into all 3 slipped stitches, knit slipped stitches together.
Decrease: Slip 1 knitwise, slip 1 knitwise, slip 1 knitwise, move 3 slipped stitches back to left needle, purl all three stitches together.
A pattern that consists of working knit stitches on the right-side, and purl stitches on the wrong-side.
usually means to work stitches together into one stitch.
If you make this on the knit side: Move yarn to front, slip the next stitch, move yarn to back, return stitch, turn work. If you make this on purl side: move yarn to back, slip the next stitch, move the yarn to front, return stitch, turn work
Yarn over twice around the needle
Not a valid email!
username already exists